What should be checked after the steel bar frame floor bearing plate is overlapped

Release time:2021-10-09 14:11 Browse times:2576second
There are construction requirements for construction, especially the project construction. Not only can we not be careless, but also we need to do a good job of corresponding inspection when it is completed in time. What should be checked after the steel grid floor bearing plate is overlapped?
1、 Check whether the geometric dimensions and structural dimensions of the reinforced grid floor support plate meet the requirements, and whether the model, number and beam position of the formwork at each part are consistent with the drawings.
2、 Determine whether the lap length of the support vertical reinforcement and plate edge on the steel beam meets the requirements, and whether the support vertical reinforcement, plate end, plate edge and edge formwork are firmly welded with the steel beam or stud.
3、 Check whether there is no slurry leakage at the cut position of slab edge and special-shaped part, and whether the temporary support of steel column edge, reinforcement grid formwork bottom and concrete edge meets the design requirements.
4、 Check whether the reserved hole position is within the allowable deviation range and whether the stud welding quality is qualified, which need to be paid attention to.